Illustrative sample. This analysis uses only public information (ClinicalTrials.gov, published literature, sponsor disclosures, and institutional web pages). Clinovia has no engagement, relationship, or communication with the University of Florida, SAB Biotherapeutics, or any institution named here, and this page does not imply their endorsement. It is not medical advice, a regulatory determination, or a forecast of any sponsor’s enrollment.

Sample deliverable ยท Healthcare economics

What might a Phase 3 diabetes trial cost? A budget model with its assumptions showing

An illustrative budget and feasibility assessment for PRISE-hATG. Every figure is a labeled planning assumption, and the page shows which ones to validate before any real decision.

$7.91MBase-case core budget
$3.92M–$15.06MLow-to-high range
72 + 36Prospective + external participants
48 monthsBudget horizon

Executive summary

This sample builds an assumption-driven cost model for PRISE-hATG, a Phase 3 trial of SAB-142 in Stage 3 type 1 diabetes. It separates four kinds of cost: per-site, prospective participant, fixed study-level, and recurring time-dependent. The 36 external SAFEGUARD participants are handled separately from prospective recruitment and treatment.

Core budget categoryLowBaseHigh
Per-site costs$143,080$143,080$143,080
Prospective participant costs (72)$1,116,180$1,116,180$1,116,180
Fixed study-level costs$186,000$409,000$891,000
Recurring costs (48 months)$2,472,000$6,242,400$12,909,600
Core budget total$3,917,260$7,910,660$15,059,860

The core budget runs from about $3.92 million to $15.06 million, with a base case near $7.91 million. Recurring operations are the largest driver, particularly in the base and high cases. External-cohort integration is excluded from these totals and estimated separately at $3,200–$17,600, depending on data readiness.

Status of these numbers. They are illustrative planning scenarios built on unverified unit costs, not vendor quotations or forecasts of actual spend. Blended at $100 per hour, the external-data estimate is also illustrative.

Study and planning assumptions

ParameterPlanning assumption
StudyPhase 3, interventional, randomized, double-blind, placebo-controlled; SAB-142
PopulationStage 3 T1D, ages 5–40
Prospective enrollmentAbout 72 participants, randomized 2:1
External cohortAbout 36 participants from SAFEGUARD (data integration only)
Sites modeled4 U.S. sites (an assumption to verify)
Treatment and follow-upInduction at baseline, maintenance at Month 6, follow-up through Month 12
Budget horizon48 months, distinct from each participant’s 12-month primary assessment

The protocol and full schedule of assessments were not available, so visit counts, procedures, staffing, monthly allocations, and unit costs are planning assumptions. The 48-month horizon is meant to cover the registry’s estimated start, primary completion, and study completion dates.

Method

Core budget = per-site + prospective participant + fixed + recurring
CategoryCalculationDriver
Per-site$35,770 × 4 sites = $143,080Number of sites
Prospective participants$15,502.50 × 72 = $1,116,180Prospective enrollment
FixedSum of setup work packages, by scenarioSetup scope and complexity
RecurringMonthly estimate × 48 monthsDuration and operating intensity

Low, base, and high are deterministic planning cases reflecting different assumed resource levels. They are not confidence intervals or probability-weighted forecasts. Each activity should have one primary cost category to avoid double counting, and monthly allowances should not hide costs that depend on actual events or volumes.

Because the base monthly recurring estimate ($130,050) is the sum of its listed categories, it replaces an earlier $128,600 figure that did not reconcile.

Consolidated budget and cost drivers

Share of the core budget by category:

Low
Base
High
Per-siteProspective participantsFixedRecurring
  • Recurring operations grow from about 63% of the low case to about 86% of the high case, so duration and intensity of management, monitoring, data, safety, technology, and laboratory work move the total most.
  • The low-to-high gap is about $11.14 million: $10.44 million from recurring costs and $705,000 from fixed costs. Site and participant totals do not change across scenarios.
  • Per-site costs stay under 4% of the total in every case, but they still need review for duplication with central budgets.

Why there is no cost-per-participant headline. Dividing the total by the 108-person combined dataset would blend prospective and external participants. The modeled prospective unit cost is $15,502.50, applied to 72 participants only.

Detailed cost breakdown

Fixed study-level costs
Work packageLowBaseHigh
Study design and regulatory coordination$41,500$75,500$150,000
Study startup and management systems$28,000$61,500$130,000
Data management setup$9,000$19,000$38,000
Safety setup$15,000$32,000$70,000
Laboratory and biomarker setup$20,000$47,000$120,000
Investigational product preparation$14,000$37,000$87,000
Quality management$12,000$26,500$53,000
Project governance$8,000$17,500$35,000
Statistical and reporting setup$14,000$33,000$67,000
Technology and security$15,000$39,500$100,000
Study closeout preparation$9,500$20,500$41,500
Total fixed$186,000$409,000$891,000
Per-site costs: $35,770 per site
CategoryPer site
Site feasibility and qualification$2,950
Site initiation and activation$5,050
Regulatory submissions and coordination$4,550
Training$2,950
Site management allowances$1,400
Participant-facing activities$5,270
Site changes and contingencies$8,950
Closeout$4,650
Total per site$35,770

Four sites give $143,080. The site-management line assumes 20 specimen shipments at $40 each plus a turnover and onboarding allowance, and excludes courier and laboratory charges.

Per-participant costs: $15,502.50 per prospective participant
CategoryPer participant
Screening$1,550.00
Enrollment$1,275.00
Study visits$9,390.00
Follow-up$1,432.50
Participant reimbursement$1,855.00
Total per participant$15,502.50

Across 72 participants this is $1,116,180. Study visits include $600 for study-drug administration and $500 for infusion monitoring, which are not added separately. External participants are excluded because their historical participation does not by itself imply new costs.

Validation flag. The visit estimate includes $900 per participant for visit payments, and the reimbursement category includes a separate $900 stipend. Confirm these are distinct payments, and remove any duplication before finalizing.

Recurring costs: monthly estimates over 48 months
CategoryLow / monthBase / monthHigh / month
Central project management$13,750$26,500$46,500
Monitoring and quality oversight$6,250$16,000$32,500
Site management$4,800$9,200$16,950
Data management$6,500$14,500$28,750
Statistical support and analysis$3,000$10,500$23,500
Pharmacovigilance and medical monitoring$6,500$15,750$31,000
Technology and infrastructure$4,200$13,400$26,500
Laboratory and specimen operations$3,500$9,250$22,250
Recruitment and timeline contingencies$3,000$14,950$41,000
Total per month$51,500$130,050$268,950
Total over 48 months$2,472,000$6,242,400$12,909,600

These assume the service profile continues for all 48 months. In practice, work such as interim analyses, amendments, and closeout is milestone-driven. Monitoring visits and travel must not be counted under both central monitoring and site management.

External-cohort data integration (excluded from core totals)
ScenarioAssumed data readinessEffortCost at $100/hr
A. Analysis-readyAuthorized de-identified dataset, data dictionary, and harmonized endpoint variables supplied32–64 hours$3,200–$6,400
B. Additional preparationSponsor must prepare and transfer data, with field mapping, endpoint and time-point reconciliation, and quality review88–176 hours$8,800–$17,600

Both include coordination, harmonization, eligibility and source-data review, quality review, integration programming, and documentation. They exclude new recruitment, treatment, visits, reimbursement, sponsor access fees, and substantial remediation of missing or inconsistent data. Choose a scenario after reviewing the sponsor’s data readiness.

Sensitivity and contingency

The three cases reflect combined changes in fixed and recurring assumptions. They do not isolate the cost of any single risk, so the gap between high and low is not the price of a particular delay.

Risk factorPotential financial effectInputs to validate
Enrollment delayLonger recruitment, site support, and downstream timelinesEnrollment rate, screen failures, duration
Study extensionMore central, site, and vendor services and licensesExtension length; workstreams that stay active
Additional monitoringMore visits, travel, quality reviews, issue resolutionRisk-based monitoring plan; site performance
Repeat testingMore assay, processing, shipment, and visit costsRepeat rates and protocol rules
Higher safety workloadMore case processing, medical review, reportingExpected event volume and reporting scope
Data or analysis reworkMore reconciliation, programming, analysisData quality, external feeds, amendment frequency

Financial controls

  • Reconcile every itemized line to its category and the consolidated totals before external use.
  • Add an incremental contingency only after checking whether fixed, site, participant, or recurring allowances already cover the activity.
  • Forecast by phase (startup, enrollment and treatment, follow-up, analysis, closeout) once a timeline exists.
  • Set reforecast triggers: enrollment below target, completion-date slippage, extra monitoring, repeat testing above plan.

Stress tests such as three- or six-month extensions or higher monitoring and safety volumes are scenario inputs, not predictions. Quantifying them requires validated unit costs and a map of which services continue during each event.

Feasibility and operational implications

The model supports preliminary planning. It does not show the study is operationally feasible at the modeled cost. Questions for sponsor and vendor review:

  • Can four sites recruit 72 prospective participants on schedule given the eligibility criteria and age range?
  • What site capabilities and safety and laboratory workflows do the treatment and MMTT assessments need?
  • Which services are sponsor-, CRO-, site-managed, or provided by specialist vendors?
  • What SAFEGUARD data are available, under what permissions, and in what format?
  • Which recurring services run all 48 months, and which concentrate in particular phases?
  • Do site payments, participant stipends, shipments, monitoring, data queries, or closeout appear in more than one category?

Benchmark context

Published cost studies show how widely trial budgets vary, but none validates these line items.

ReferenceUse hereLimitation
Sertkaya et al. (2016)Context for Phase 3 cost variation and drivers. Reported average costs of roughly $11.5M–$52.9M across selected therapeutic areas.Data from 2004–2012, not inflation-adjusted; areas and definitions differ
Analysis of 225 pivotal trials (2020)Context for trial-level and per-patient cost. Estimated a median of $19M per trial and $41,413 per patient.Relied partly on default assumptions; excluded some sponsor costs such as design, contract monitoring, and medication

Any comparison should keep each source’s year, cost definition, population, and scope. Actual site budgets and vendor quotations are needed to replace planning estimates.

Recommended next steps

#ActionOutput
1Obtain protocol and schedule of assessmentsVerified visit and procedure quantities and timing
2Confirm site list and enrollment planValidated site count, enrollment assumptions, site scope
3Reconcile participant payments and treatment responsibilitiesNo duplicated stipends or unpriced treatment obligations
4Confirm sponsor and vendor ownership by workstreamResponsibility matrix; overlaps removed
5Review site budgets and vendor quotationsStudy-specific commercial rates
6Review SAFEGUARD data readinessChoice of Scenario A or B
7Build a phase-based forecast and sensitivity modelTiming-aware baseline and incremental risk exposure

Recommended use. Treat this as a structured planning baseline for sponsor discussion and scope definition, not a contracted budget.

Limitations and exclusions

  • The full protocol and schedule of assessments were unavailable, so visit counts and procedures are illustrative.
  • The four-site configuration and 48-month horizon are assumptions.
  • Some investigational-product and treatment lines have no unit rate entered. A $0 means no cost has been entered, not that the product or activity is free.
  • Unit costs and monthly allocations are not quotations or validated market rates.
  • Duplication may exist across participant payments, site and central monitoring, regulatory work, specimen handling, data queries, and closeout.
  • Taxes, institutional overhead, currency effects, inflation, and contract minimums are not confirmed as represented.
  • Clinovia makes no representation that actual costs will fall within the modeled range.

Work with Clinovia

Need a budget model you can defend?

We combine quantitative analysis with practical software to support protocol review, feasibility, and healthcare economics for life sciences teams.